Rubber gym flooring
Flooring that takes the drops, quietly.
Recycled rubber rolls, mats and tiles for gyms, schools, hotels and condos. Custom colors, logo inlays, acoustic guidance and pro installation across Canada.
Applications we serve
One product family, six very different rooms.
Commercial gyms
Free weights, racks, sled lanes, platforms.
Schools and universities
Weight rooms, field houses, multi-use spaces.
Hotels and hospitality
Quiet fitness rooms near guestrooms.
Condos and multi-residential
Amenity gyms with vibration control.
Team and pro facilities
Custom logos, colorways, heavy-duty use.
Studios and PT clinics
Cleanable surfaces, edge finishing, branding.
Choose the right format
Rolls, mats or tiles. Each has a job.
| Format | Best for | Pros | Considerations |
|---|---|---|---|
| Rolls | Large zones and a seamless look | Clean lines, fewer seams, fast coverage | Heavier to handle, plan seam layout and adhesion |
| Mats | Under racks and spot protection | Affordable, easy single-piece replacement | Edges visible, can migrate if not secured |
| Tiles | Modular rooms and phased installs | Repairable pieces, flexible layouts | Grid seams visible, needs tight fit and trimming |
Key specifications
Ask our team for data sheets and test reports for your project file.
| Roll size | 100 sq ft (4 ft x 25 ft). 50 ft length on request. |
|---|---|
| Thickness | 6 mm, 8 mm. Others on request. |
| Material | 100 percent recycled rubber |
| Colors | Black plus standard colors. Custom blends available. |
| Force reduction | Approx. 13 percent |
| Energy return | Approx. 85 percent |
| Origin | Made in USA |
| Warranty | 5 years manufacturer |
| Lead time | Typically ships in 3 to 4 weeks. Rush options on request. |
Why Gorila rubber
- Durable surface with slip and gouge resistance for high traffic
- Sound absorbing for quieter training environments
- Recycled content with low maintenance
- Logo and color customization for brand consistency
- Pro installation and layout support across Canada
Acoustic and compliance support
We coordinate with property managers and general contractors to meet written requirements.
Noise and vibration
- Target STC and IIC goals for condos and hotels
- Layering strategies: rubber, underlayment, platform
- Equipment isolation and bar drop mitigation plans
Code and safety
- Slip resistance and fire testing documentation
- Low VOC options and indoor air quality guidance
- Edge transitions, ramps and accessibility details
Selected installs
Pro team weight room
Custom color mix, platforms, logo inlays, acoustic underlayment.
Downtown condo gym
Noise targets met with a layered system and clean edge transitions.
Hotel fitness room
Low VOC materials and a quiet cardio zone near guestrooms.
Install guide
Three steps, then the details.
Acclimate 48 hours
Keep rolls flat at room temperature, 15 to 25 C, before install.
Plan and cut
Align grain direction. Pre-trim ends for a square fit.
Tape or glue
Semi-permanent tape or permanent adhesive.
Preparation
Tools: utility knife, straight edge, measuring tape, chalk or masking tape, double-sided tape or adhesive, 1/4 in notched trowel for adhesive.
Important. Place rolls flat in the installation room at least 48 hours before install. Ideal temperature 15 to 25 C.
Inspect and align
Match grain direction of all rolls. Trim up to 1 in from ends for a perfect, square fit.
Step by step
Measure and plan
- Measure the area and add 5 to 10 percent extra.
- Use chalk or masking tape to mark alignments.
Cutting the roll
- Cut each roll to length with a straight edge and knife.
- Cut slightly long, then final trim in place.
Option A. Double-sided tape
- Anchor the first 2 to 3 ft with tape and weight it down.
- Work in 4 to 10 ft sections along edges and seams.
- Place rolls snug without over-pressing seams.
Best for lighter traffic or temporary layouts.
Option B. Adhesive
- Trowel adhesive over the first 2 to 3 ft with a 1/4 in notched trowel at about 45 degrees.
- Continue in 4 to 10 ft sections, weighting as you go.
- Keep edges square. Press enough to avoid lifting.
Best for heavy use and high-traffic facilities.
Final checks
- Verify tight seams with no gaps.
- Walk the area to find air pockets. Trim at walls and obstacles.
Pro installation
We offer certified installation across Canada. Ask for a turnkey quote with materials, labor and logistics.
FAQ
What thickness should I choose?
Is it eco-friendly?
How do I clean it?
Can you help us meet condo or hotel noise limits?
Lead time
Rubber flooring and platforms
Request a quote
Tell us about the room, the base and the noise targets. We come back with a layout and a price.