Width15 ft
Total thickness~0.76 in
Backing5 mm foam
Warranty8 years
Specs shown reflect Gorila Pro Turf. Alternate builds available for special use cases.
Installations and close-ups
Standard Turf
- 15 ft width, sold by the linear foot
- Low abrasion fiber for skin-friendly work
- 5 mm cushioned backing for shock and noise
- Ideal for sleds, sprints, and everyday training
Custom Turf
- Logos and lettering tufted or inlaid
- Multi-lane linework and numbers
- Cut to your exact space and use case
- Pro layout help and installation available
Key Specifications
| Face weight | 36 oz |
|---|---|
| Pile height | 0.56 in |
| Total thickness | ~0.76 in |
| Backing | 5 mm cushioned foam |
| Width | 15 ft |
| Length | Cut to order |
| Warranty | 8 years |
| Origin | Made in USA |
| Typical lead time | Ships in 2 to 3 weeks |
Great for
Sled pushes Sprint lanes Agility work Batting cagesGood to know
- Indoor by default. Outdoor and drainage builds available.
- Transitions and end caps keep edges tidy and safe.
- Glue down or tape seams depending on base and traffic.
- Low VOC options available on request.
Looking for an alternative construction? Ask our team for recommendations based on your use case.
Install guide
1
Prep
Prep base
Clean, dry, flat subfloor. Concrete is ideal.
2
Cut
Measure and cut
Chalk line, fresh blade, gloves for safety.
3
Seam
Lay and seam
Same pile direction. Tape or adhesive under seams.
Tools and materials
- Measuring tape
- Chalk line or marker
- Utility knife with a fresh blade
- Adhesive for permanent installs
- Seam tape for joints
- 50–100 lb roller
- Gloves
- Broom or vacuum
Step 1. Prepare the area
- Clear the area. Remove obstacles and dust.
- Inspect the subfloor. It must be level and dry.
- Clean the subfloor. Sweep or vacuum. Damp mop concrete if needed.
Step 2. Measure and cut
- Measure. Confirm dimensions.
- Mark. Roll out turf and snap chalk lines.
- Cut. Follow lines with a fresh blade. Wear gloves.
Step 3. Layout and seams
- Unroll. Allow 24 hours to acclimate.
- Align. Keep fibers in the same direction.
- Dry fit. Trim edges for tight joints.
Step 4. Secure the turf
- Temporary: Lay in place with edges flush.
- Permanent:
- Spread adhesive in sections.
- Lay turf and press firmly.
- Roll to remove air and set bond.
Care and maintenance
- Daily: Vacuum or sweep to lift pile.
- Spills: Mild soap and water; avoid harsh solvents.
- Periodic: Brush or roll to keep seams flat and pile lively.
- Plan seams away from doors and tight turns when possible.
- Use painter’s tape to preview lane markings before committing.
- Keep fibers free of glue while curing.
FAQ
How abrasive is it on skin
Fibers are chosen for low abrasion, so burpees and crawls are more comfortable than outdoor field turf.
Can I get logos and lane numbers
Yes. Logos and markings can be tufted or inlaid. Send vector artwork if possible for the cleanest edges.
Do you install
We can coordinate professional installation for commercial or home gyms. Select installation in the quote form below.
What about outdoor use
Outdoor builds with drainage and UV packages are available. Tell us your climate, sun exposure, and base details.
Lead time
Standard rolls usually ship in 2 to 3 weeks. Custom projects vary based on artwork and lane complexity.